Case Studies

INTERCITY EXPRESS PROGRAMME, UK

Blaschke makes express delivery Having worked on numerous orders for the Department for Transport’s Intercity Express Programme (IEP), we were in a perfect position to introduce our partner firm, Blaschke, when an innovative approach to exhaust extraction was required at depots welcoming the project’s new trains. The contract The Hitachi Class 800/801s that are being […]

READ MORE

GREATER ANGLIA – CLACTON RAIL DEPOT

Collaboration at Clacton Equipment suppliers, including Mechan, joined forces to transform the train lifting facility at Clacton, in preparation for a new fleet of bi-mode trains. The contract The introduction of Stadler trains on regional routes in Norfolk, Suffolk and Cambridgeshire meant Greater Anglia’s Clacton Rail Depot required the entire train lifting facility to be […]

READ MORE

Capital Contract Is Just The Ticket

SIEMENS RAIL SYSTEMS UK / THAMESLINK The landmark UK rail project, Thameslink, brought us a fantastic boost in sales. Four bogie drops, worth more than £1 million, were ordered for two new maintenance facilities being constructed as part of this historic upgrade to London’s transport network. THE CONTRACT Commissioned by Siemens Rail Systems UK, the […]

READ MORE

BALFOUR BEATTY – ASHFORD DEPOT

Blowing away the track experts A flexible set of Mechan lifting jacks is helping one of the UK’s largest infrastructure groups maintain track quality in the south east. The contract In August 2019, Balfour Beatty’s rail business commissioned a set of eight mobile jacks for its Ashford depot in Kent. Their primary function is to facilitate the […]

READ MORE

1 2 3 4
Terms and Conditions | Privacy Policy
© Copyright 2024 Mechan. All Rights Reserved.

Website design and build by Grey Matter | web design sheffield